TDP 17 - A Biological Sequential Reactive Barrier (Serebar): Design, Installation and Performance at a Former Manufactured Gas Plant (Fmgp) Site in South West England (2008)
TDP 24 - Application of Thermally Enhanced Soil Vapour Extraction (TESVE) to Remediate the Unsaturated Zone at the Western Storage Area (WSA), Harwell (2010)